7. How long does it take to modernise a locomotive?
The modernisation of a locomotive is a complex service, which means that the timeframes are longer than for a normal repair:
- On average, modernisation takes between 4 and 8 months.
- The timeframe depends on the scope of the project (e.g. engine replacement, installation of control systems) and the specific production timescales for the components.
LTG